RAM

RAMP

Random Observation

Random Sample

Range

Rank

Ranked Positional Weight Method (“RPWM”)

Ranking

Rapid Implementation

Rationale

RBS

RDBMS

Readiness Assessment

Real Property

Real Time

Real World

Realization

Re-baseline

Rebaselining

Re-baselining

Recognized Profession

Recommend

Recommendation

Reconditioned

Record

Record Drawings

Record Retention

Recording Facts

Records

Records Management

Recovery Schedule

Recruitment, Selection and Job Placement

Recurring Costs

Recurring Task

Reduced Inspection

Reduction in Force

Redundancy

Reengineering

Reference Group

Referent Power

Refinement, Schedule Refinement

Regression Analysis

Regulations

Regulatory

Regulatory Personnel

Reimbursable Expenditure

Reinforcement Theory

Rejected

Rejection Number

Related Base

Relational Database Management System. (“RDBMS”)
A management system that makes use of a relational type database.

Relationship

Relationship Float

Release

Release Claims

Release Manager

Reliability

Reliability Assurance

Remaining Available Resource

Remaining Duration

Remaining Float (“RF”)

Re-measurement

Repetitive Work Sequence

Replacement Theory

Replacement Value

Replan

Replanning

Report

Report Specification File

Reporting

Reporting by Responsibility

Repository

Re-profiling

Reprogramming

Reputation

Request for Appropriation (“RFA”)

Request for Change (“RFC”)

Request for Information

Request for Proposal

Request for Quotation

Request for Quotations

Requirement

Requirement Attribute

Requirement Specification

Requirement Type

Requirements

Requirements Definition

Requirements Flowdown

Requirements Management

Requirements of Society

Requirements Traceability

Requirements Traceability Matrix

Requirements Tracing

Requirements Workflow

Reschedule

Rescheduling

Research

Research and Development

Reserve

Reserve For Scope Changes

Residential Construction

Residual Risks

Residual Value

Residue File

Resolution

Resource

Resource Accumulation

Resource Aggregation

Resource Allocation

Resource Allocation Process

Resource Analysis

Resource Assignment

Resource Availability

Resource Availability Date

Resource Availability Pool

Resource Breakdown Structure (“RBS”)

Resource Calendar

Resource Category

Resource Code

Resource Constraint

Resource Description

Resource Driven Task Durations

Resource Effort

Resource Group

Resource Histogram

Resource Identification

Resource Level

Resource Leveling

Resource Limited Scheduling

Resource List

Resource Management

Resource Needs

Resource Offset

Resource Optimization

Resource Period

Resource Plan

Resource Planning

Resource Plots

Resource Pool

Resource Profile

Resource Requirement

Resource Scheduling

Resource Set

Resource Smoothing

Resource Thresholds

Resource Total

Resource Unit

Resource-Based Duration

Resource-Limited Planning

Resource-Limited Resource Scheduling

Resource-Limited Schedule

Resources

Resourcing Plan

Response Planning

Response System

Response Time

Responsibility

Responsibility Assignment Matrix (“RAM”)

Responsibility Chart

Responsibility Charting

Responsibility Matrix

Responsibility/Accountability Matrix (“RAM”)

Responsible Organization

Restraint

Restructuring

Resubmitted Lot

Result

Results

Retainage

Retention

Return on Investment (“ROI”)

Reuse

Revamp

Revenue

Revenue Cost

Review

Reviewers

Revision

Reward

Reward Power

Rework

RF

RFA

RFC

RFP

RFQ

Risk

Risk & Readiness Assessment

Risk Analysis

Risk Analysis Histogram

Risk Analyst

Risk and Contingency Management

Risk Assessment

Risk Assessment Tables

Risk Assumption

Risk Avoidance

Risk Brainstorming

Risk Custodian

Risk Data Applications

Risk Deflection

Risk Diary

Risk Evaluation

Risk Event

Risk Event Status

Risk Factor

Risk Identification

Risk Management

Risk Management Budget (“RMB”)

Risk Management Plan

Risk Matrix

Risk Mitigation

Risk Mitigation Strategy

Risk Prioritizing

Risk Probability

Risk Process Manager

Risk Quantification

Risk Ranking

Risk Reduction

Risk Register

Risk Response

Risk Response Control

Risk Response Development

Risk Response Plan

Risk Response Planning

Risk Response System

Risk Review

Risk Sharing

Risk Transfer

Risk Treatment

Risk Value

Risk, close-down report

Risk, process plan

Risk, project risk

Risks

RMB

RMP

ROI

Role

Roles

Roll Up

Rolling Wave

Rolling Wave Concept

Rolling Wave Planning

ROM

Rough Order of Magnitude Estimate (“ROM”)

Royalties

RPWM

Rubber Baselining

Rule of Thumb

Rules

Rules of Evidence

Run Time

Runaway Project